Gundog Gear Tracking Long Lead

Gundogger SKU: LEA-BLO-POL-15M-0001

Gundog Gear Tracking Long Lead

Gundogger SKU: LEA-BLO-POL-15M-0001
When range matters but control is critical, the Gundog Gear Tracking Long Lead delivers the freedom to work your dog at distance without sacrificing responsiveness. Built from durable 8mm polypropylene rope, this field-ready longline is de... When range matters but control is critical, the Gundog Gear Tracking Long Lead delivers the freedom to work your dog at distance without sacrificing ... Read more
Size
Regular price $49.99
/
Earn Points
Members earn 40 points with this purchase.
Sign up and learn more about our membership
Tax included. Shipping calculated at checkout.
  • Brand: Gundogger.
  • Product Type: Durable tracking long lead designed for gundogs and working dogs.
  • Available Lengths: Multiple length options including 10 metre and 15 metre variants.
  • Material: Constructed from heavy-duty polypropylene rope for superior strength and durability.
  • High Visibility: Blaze orange colour ensures the lead is easily seen on the ground and in the field.
  • Secure Attachment: Equipped with a 360-degree round swivel zinc alloy clip to prevent tangling.
  • Handler Control: Features a handle at the end and a rope design that can be safely stepped on for foot control.
  • Training Utility: Specifically designed to allow dogs a wide range of movement while maintaining handler control.
  • Included Accessories: Comes with a dedicated orange travel bag for easy storage and transport.
  • Versatile Use: Indispensable tool for training tracking, stalking, and bird dogs in varied terrain.

When range matters but control is critical, the Gundog Gear Tracking Long Lead delivers the freedom to work your dog at distance without sacrificing responsiveness. Built from durable 8mm polypropylene rope, this field-ready longline is designed for structured tracking, recall training and advanced gundog development. Whether you are running drills in open paddocks or reinforcing obedience in dense cover, this tracking lead gives your dog room to work while keeping you connected.

Gundog Gear Tracking Long Lead Key Features:

  • Available Lengths: 10 metre and 15 metre options.
  • 8mm Polypropylene Rope: Strong, lightweight and built for repeated field use.
  • Blaze Orange Colour: High visibility on the ground and in bush environments.
  • 360° Swivel Zinc Alloy Clip: Rotating round clip attaches securely to most collars and reduces tangling.
  • Foot-Control Friendly: Designed to be safely stepped on during training to maintain control.
  • Reinforced Handle End: Securely bound for reliable grip and durability.
  • Includes Travel Bag: Supplied in an orange storage bag for easy transport and stowing.

Specially designed for tracking and field training, this longline allows your gundog to range naturally while giving you the ability to reinforce commands when required. Ideal for hunting dogs, tracking dogs, stalking dogs, big game dogs and bird dogs, it is an essential training tool for handlers who demand precision and reliability.

Important Safety Information

  • This is a training aid only and not a tie-off rope.
  • Do not leave your dog unattended while attached to this lead.
  • Excessive pulling or constant yanking may compromise the integrity of the rope.
  • Improper use may pose a strangulation risk.
  • Not intended for water-based training activities.

Built for serious training sessions and demanding field work, the Gundog Gear Tracking Long Lead offers strength, visibility and dependable control when working dogs at distance.

Check These Products Out

Recommended add-ons and related products.

Gundog Gear Safety Vest - Reflective

Gundog Gear Chain Collar

Gundog Gear PVC Retrieve Bumper Dummy

Gundog Gear Pheasant Dummy

GUNS AND AMMO CAN NOT BE SHIPPED, PLEASE VISIT ONE OF OUR STORES TO PURCHASE.

Shipping Rates & Options
We offer straightforward flat rate shipping options:

  • Standard Shipping - $14.99: Generally delivered within 2 - 4 days of dispatch to metropolitan areas. Please allow an extra 1 - 2 days for us to pick and pack your order. You will be given tracking details to monitor your order's journey.
  • Jump The Queue Shipping - $19.99: For those in a hurry, orders placed before 2 pm AEST will be packed and dispatched on the same day. If placed after 2 pm AEST, they'll be dispatched the next business day. Tracking details will be provided for your convenience. Please note that this is not express shipping, for express shipping quotes please contact our team at 07 3391 2299.

 
Additional Shipping Charges

  • Bulky Items Surcharge - $39.99: Certain items due to their size and nature require an additional fee for shipping. Bulky items include, but are not limited to, Firearms, Compound Bows, and Spearguns.
  • Extra Bulky Item Surcharge - $89.99:Certain items due to their size and nature require an additional fee for shipping. Extra Bulky items include, but are not limited to, Firearm Safes, Treestands and Feeders.
  • Shipping Insurance - $4.99: For added peace of mind, avail of our Australia-wide shipping insurance to safeguard your order during transit.

 
Shipping Specifics
Please note:

  • Prices mentioned apply mainly to mainland Australia. Offshore islands and territories might face extra delivery costs. In such instances, our customer service will reach out to you.
  • For larger or bulkier orders which necessitate road transport, delivery times might extend.
Recently viewed